In 2017 Avard Civil was awarded the contract to construct a new recreation facility on a partial Greenfield site.

The project involved:
Site strip (23,000 m2)
Removal of the existing courts and fencing
6 metre site cut into rock (2,600 m3)
271 metres of 225mm drainage
14 pits
Construction of a 100 lineal metre RECO modular and strap retaining wall
2,700 m2 concrete slab
Plexipave finish for three new show courts
Architectural curved bleachers and timber seating
148 metres poured insitu 450mm high concrete seating
532 m2 asphalt pathway with concrete edging
Rain garden / biorentention
New twin lane cricket net facility
External exposed aggregate paving
95 metes of new black chainmesh fencing
Upgrades to existing asphalt netball courts
Construction of a 32 tread concrete stairway
Installation of 7,800 plants
Lighting towers
Coach boxes
Accessible ramp and handrail
Bike rails
Drinking fountains
TGSI’s